Fannie Mae Selling Guide B4-2.2-01 — Limited Review Process
Fannie Mae Selling Guide B4-2.2-01 — Limited Review Process.
Verbatim regulatory text
Verbatim provisions from Fannie Mae Selling Guide B4-2.2-01 — Limited Review Process — each quote is a verified substring of the regulator-published source snapshot, not retyped. Quoted for reference; this is not legal advice. The operational layer (P&P updates, prompts) lives in the regulation update kits.
Fannie Mae Selling Guide B4-2.2-01 — Limited Review Process
B4-2.2-01, Limited Review Process (04/02/2025) Introduction This topic contains information on the Limited Review process performed by lenders, including: Unit and Project Type Eligible for Limited Review Transactions Eligible for a Limited Review Limited Review Eligibility Requirements CPM Delivery Restrictions Notifications Unit and Project Type Eligible for Limited Review To be eligible for a Limited Review, the unit securing the mortgage must be an attached unit in an established condo project. Transactions Eligible for a Limited Review The following table describes the transactions that are eligible for a Limited Review. Limited Review Eligible Transactions -Attached Units in Established Condo Projects (For Projects Outside of Florida) Occupancy Type Maximum LTV, CLTV, and HCLTV Ratios Principal residence 90% Published May 6, 2026 657 Limited Review Eligible Transactions -Attached Units in Established Condo Projects (For Projects Outside of Florida) Second home 75% Investment property 75% Attached units in established projects located in Florida are subject to more restrictive LTV ratio requirements under the Limited Review process. See B4-2.2-04, Geographic-Specific Condo Project Considerations, for additional information. Limited Review Eligibility Requirements In completing a Limited Review, the lender must ensure that the project and subject unit meet the eligibility requirements described in the following table. ✓ Limited Review Eligibility Requirements The project meets Requirements Applicable to All Properties in a Condo, Co-op, or PUD Project described in B4-2.1-01, General Information on Project Standards. The project is not an ineligible project. (See B4-2.1-03, Ineligible Projects). The project does not consist of manufactured homes. Note: Manufactured housing projects require a Fannie Mae PERS review or a Full Review. No more than 15% of the total number of units in the project are 60 days or more past due in the payment of each special assessment. These requirements apply to both DU loan casefiles and manually underwritten loans. If the project and loan transaction are eligible for and meet all of the eligibility requirements of the Limited Review process, the lender is not required to validate that the project also meets the eligibility requirements of another project review type. However, if the LTV, CLTV, or HCLTV ratios exceed the limits above, or in the event the lender becomes aware of a circumstance that would cause the project or transaction to be ineligible under a Limited Review, the lender must use one of the other project review methods to determine project eligibility and the project must meet all of the eligibility requirements of that selected alternate project review type. Note: For loans eligible for Limited Review that receive a CPM Approved by Fannie Mae message in DU, see CPM Approved by Fannie Mae Message in DU in B4-2.2-02, Full Review Process, for additional information. Published May 6, 2026 658 CPM Delivery Restrictions Notifications Project transaction eligibility or other loan-level restrictions will display in CPM and/or on the DU underwriting Findings report, when applicable. When CPM displays a delivery restriction for a specific project, lenders may only sell loans that comply with the stated restrictions, even if the loan receives a CPM Approved by Fannie Mae message in DU. For example, loans in some projects may be limited to certain occupancy types (such as principal residences only, or principal residences and second homes), or there may be limit on the LTV ratios. Recent Related Announcements The table below provides references to recently issued Announcements that are related to this topic. Announcements Issue Date Announcement SEL-2025-02 April 02, 2025 Announcement SEL-2023-06 July 05, 2023